
Clontarf Energy provides update on 1H19 operations
A key focus for the period ended was ongoing discussions with the Ghanaian authorities about the ratification of the company's signed Petroleum Agreement on the Tano 2A Block offshore Ghana.
Browse the latest upstream project news news and articles.

A key focus for the period ended was ongoing discussions with the Ghanaian authorities about the ratification of the company's signed Petroleum Agreement on the Tano 2A Block offshore Ghana.

The 13/23c-9 pilot well on i3 Energy's 100% owned Liberator Field in the North Sea has now been plugged and abandoned as planned following completion of the vertical seismic profile (VSP) survey and shear wave sonic logging.

The company has provided an update on its onshore European oil and gas project operations.

The project saw Welaptega use its new edge tracking data system and its patented CMS technology to inspect the mooring system of BP’s PSVM FPSO, which is situated in Block 31 offshore Angola.

During the contract period, Maersk Drilling will complete upgrades to the Maersk Intrepid to turn the jack-up into the first hybrid, low-emission rig.

The waterflood project is Chevron’s first in the deepwater Wilcox trend and is expected to contribute an estimated ultimate recovery of more than 175 million boe.

The company will work with BP to drill and evaluate the Puma West prospect , while it has acquired from ExxonMobil the Hershey prospect.

The survey is taking place in the MSGBC Basin, with fast-track data available four months after acquisition.

CGG Multi-Client & New Ventures have been applying seismic technology in the Delaware Basin to overcome the challenge of a near-surface evaporite formation.

Europa will be assigned a 75% interest in, and operatorship of the licence, located in the Agadir Basin.

The contract is to support Al Dhafra Petroleum's operations at Haliba field, located onshore along the south-east border of Abu Dhabi.

Recoverable Utgard resources are estimated at around 40 million boe and daily production on plateau will be around 43 000 boe.