GEODynamics introduces professional grade perforating systems
The new patent-pending system combines professional grade gun loading and assembly features with FracIQ™ Limited Entry Perforating shaped charges.
The new patent-pending system combines professional grade gun loading and assembly features with FracIQ™ Limited Entry Perforating shaped charges.
Shale Support will work alongside Shale Rail, as a strategic partner for supply chain and transportation needs, leveraging the company’s quality service, history of safety and 20-plus years of industry expertise.
Santos welcomes the Northern Territory Government’s decision to implement the prerequisite conditions for recommencement of onshore gas exploration by the end of 2018.
This article from Dave Bucior, Business Development Manager for Tracerco's Reservoir Business, examines how useful reservoir surveillance technology has become for pinpointing the appropriate location for a well to be drilled.
Mosman identified the development potential would be to drill horizontal wells which it expected would increase both Reserves and production.
Hexion is the first company to develop mobile resin coating technology, offering efficient manufacturing of resin coated proppants on any substrate. Manufacturing can occur in any location that offers optimum logistics to the wellsite, even internationally.
These companies represent 61% of US shale oil production in 2018 and were chosen for their focus on oil output.
Reveal Energy Services announced today the company has validated more than 2500 hydraulic fracturing stages throughout the US with its simple, accurate, affordable pressure-based fracture maps.
BNK Petroleum have begun drilling the Glenn 16-2H well in the company's Tishomingo Field.
Unconventional oil reserves across the top ten countries stand at 9.2% (45.8 billion barrels), oil sands reserves stand at 6.7% (33.3 billion barrels), and heavy oil represents 4.5% (22.2 billion barrels) of all remaining reserves.
Reveal Energy Services has announced that it has produced and delivered the first near real-time DiverterSCAN technology results, which allowed an operator to identify a diversion design that enhances hydraulic fracturing fluid distribution.
The multi-million dollar project includes the recently completed project management, fabrication and construction of approximately 60 miles of 12 in. and 8 in. pipeline for the gathering system.
The agreement increases Shale Support’s access into the Ohio, West Virginia and Western Pennsylvania markets, providing storage while allowing it to be one of the lowest cost providers of frac sand to the region.
The fracture stimulation is anticipated to take approximately two weeks, after which the equipment will be removed and the flowback will commence.
Angus Energy plc. has announced that the BDF drilling rig 28 has arrived on location at the Lidsey Oil Field and is in the process of rigging up prior to rig acceptance. Ancillary equipment and casing is already on site and equipment inspections continue.