Skip to main content

BNK Petroleum Inc. spuds Glenn 16-2H well

Published by , Deputy Editor
Oilfield Technology,


BNK Petroleum Inc. has announced that the company has begun drilling the Glenn 16-2H well in the company’s Tishomingo Field with Power Rig #7.

The company has a 100% working interest in the Glenn 16-2H, which is located directly south of the company’s Brock 9-2H well and is the first well in the Company’s 2018 drilling program. The well is expected to take about 30 days to drill. Once drilling is complete, the rig is scheduled to move to the Scott 14-2H location which is about two miles to the east of the Glenn 16-2H. Fracture stimulation of the Glenn 16-2H well will be scheduled as quickly as possible.

Wolf Regener, President and CEO commented “We are looking forward to the continued success of our drilling campaign, which we believe will continue to increase our cash flow and reserves.”

Read the article online at: https://www.oilfieldtechnology.com/hydraulic-fracturing/15012018/bnk-petroleum-inc-spuds-glenn-16-2h-well/

You might also like

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Upstream news US upstream news Upstream drilling news Oil & gas news