Skip to main content

Oil & gas news

88 Energy provides operational update on Project Icewine

The Icewine#2 well was shut-in on 10 July to allow for imbibition and pressure build up to occur within the HRZ shale. Flow testing re-commenced on 31 August at 10:26 (AK time), and was suspended on 18 September (AK time).

 
 
 
 

Weatherford introduces V0-qualified retrievable well barrier

The barrier has a large operational envelope: it is capable of withstanding pressure differentials up to 10 000 psi (68.95 MPa) and temperatures between 40 and 325°F (4 and 163°C), which reduces the loss-of-containment risk in extreme environments.

 
 
 
 

Fotech achieves world first with new pipeline monitoring solution

As oil and gas operators around the world continue to face increasing pressure to enhance their pipeline monitoring and security measures, Fotech has launched LivePIPE II – enhancing the world’s most reliable real time pipeline protection technology.

 

DuPont to supply DynaWave scrubbing technology for Zohr gas field

DuPont will deliver the technology license, engineering and equipment for two MECS DynaWave wet gas scrubbing units while KT will provide the related on-shore gas plant units in Port-Saïd with Claus and Tail Gas Treatment Units.