Aker Solutions wins Troll FEED contract with EPCI option from Statoil
Published by David Bizley,
Editor
Oilfield Technology,
Aker Solutions won a contract from Statoil for front end engineering and design of a module that will increase output at Troll, one of Norway's largest natural gas fields.
The order includes an option for engineering, procurement, construction and installation of the module, which will receive and process gas from the Troll West field before it is exported to the onshore Kollsnes facility near Bergen in Norway. The module will be installed on the Troll A platform in the North Sea.
"We're excited to start working on the next phase of this important development and look forward to collaborating with Statoil to optimise value from this field," said Aker Solutions Chief Executive Officer Luis Araujo.
The Troll field, located about 65 km west of Kollsnes, contains around 40% of Norway's offshore gas reserves. Production from the field is expected to continue beyond 2050.
The contract will be booked as part of Aker Solutions' third-quarter orders.
Image courtesy of Øyvind Hagen/Statoil.
Read the article online at: https://www.oilfieldtechnology.com/offshore-and-subsea/21092017/aker-solutions-wins-troll-feed-contract-with-epci-option-from-statoil/
You might also like
ADNOC announces first production from Belbazem offshore block
ADNOC has announced the start of crude oil production from its Belbazem offshore block, underscoring the company’s commitment to responsibly meet the world’s growing demand for energy.