Archer awarded multi-well P&A contract by TAQA
The Archer Topaz modular rig has been contracted by TAQA to perform a 21-well plug and abandonment campaign for their Northern North Sea Cormorant Alpha platform.
The Archer Topaz modular rig has been contracted by TAQA to perform a 21-well plug and abandonment campaign for their Northern North Sea Cormorant Alpha platform.
The company has shut in the 205/21a-7Z well as it was unable to achieve its target rate sustainably from the two Lancaster Early Production System wells.
Aberdeen Drilling Consultants has combined guidance from leading advisory, regulatory and legislative bodies to produce a Covid-19 Resilience Audit.
ABS is providing detailed guidance on navigating the unique regulatory environment for offshore operators in Brazil.
The award includes the provision of general and advanced non-destructive testing and fabric maintenance inspection services across the operator’s onshore and offshore facilities in the Middle East.
The survey took place in the Petrel field, located in the Bonaparte Basin.
Tendeka will provide its inflow control technology to help increase production from Malaysian assets of an independent operator.
Maersk Supply Service will remove four 30 in. jacket-mounted drilling conductors and two associated conductor guide frames using an I-class vessel.
The deal, worth an undisclosed multimillion-pound sum, will see the Aberdeen-headquartered firm deliver complex modifications for Spirit Energy's E&P business.
James Fisher Asset Information Services is set to collaborate with Aberdeen University on the R2S Digital Twin solution.
Previous deal partner Petrogas is no longer part of the transaction.
Licence P2170 is located in the Greater Buchan Area in the North Sea.
Version 4.5.0 of the facies map browser allows users to expand their subsurface knowledge of these regions of exploration.
The global framework agreements are conceptual engineering and for early engineering and FEED services.
ODE has acted as operations and maintenance provider for the asset since the project phase and successfully transitioned the platform from normally manned to not normally manned status in recent years.