Skip to main content

Solan Field produces first oil

Published by , Digital Assistant Editor
Oilfield Technology,


Premier has announced that first oil from the Solan field was safely achieved on 12 April 2016.

The first producer well (P1) is being naturally flowed at a restricted initial rate. The well will remain free flowing for a short time after which the ESP (pump) will be turned on.

Following this initial period and, taking advantage of the availability of the Superior Flotel, over which Premier has contractual options until the end of May, Premier intends to carry out a planned production shut down to complete the final commissioning of the water injection plant, the tie in of the second water injection well (W2) and preparation for the tie in of the second producer well (P2).

The Ocean Valiant rig is presently drilling the second producer well (P2y), where 1500 ft of high quality reservoir sands have been intersected and which is expected to be completed and tied-in by mid-year. Production from the field is expected to build up to an anticipated production rate of 20-25000 beo/d in 2H16 when both pairs of producer-injector wells will be on stream.

Edited from press release by

Read the article online at: https://www.oilfieldtechnology.com/offshore-and-subsea/13042016/first-oil-produced-from-the-solan-field-3020/

You might also like

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Oil & gas news