President Energy spuds third development well in Argentina
Published by Aimee Knight,
Editorial Assistant
Oilfield Technology,
The PFO 1005 development well at the Puesto Flores field, being the last of the recent three well sequence, has now been spudded. With a provisional target depth of 2700 m, it is estimated that the well will be drilled in approximately 21 days.
The recently drilled PFE 1001 well is expected to be completed with a work over rig and be on stream by the end of next week.
Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/27112018/president-energy-spuds-third-development-well-in-argentina/
You might also like
Acteon strengthens global offshore engineering capability with acquisition of Upstream Engineering
The move significantly expands Acteon’s global engineering capability and creates one of the industry’s most comprehensive fixed platform offerings.