President Energy spuds third development well in Argentina
Published by Aimee Knight,
Editorial Assistant
Oilfield Technology,
The PFO 1005 development well at the Puesto Flores field, being the last of the recent three well sequence, has now been spudded. With a provisional target depth of 2700 m, it is estimated that the well will be drilled in approximately 21 days.
The recently drilled PFE 1001 well is expected to be completed with a work over rig and be on stream by the end of next week.
Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/27112018/president-energy-spuds-third-development-well-in-argentina/
You might also like
SPH Engineering opens applications for the first Global Drone Operations Awards
The awards are designed to recognise advanced drone operations that solve complex field challenges in industrial, scientific, and engineering environments.