Skip to main content

President Energy spuds third development well in Argentina

Published by
Oilfield Technology,


President Energy has provided an update on its current drilling programme at the Puesto Flores/Estancia Vieja Concession in Rio Negro Province, Argentina (President 90% and operator - Edhipsa 10%).

The PFO 1005 development well at the Puesto Flores field, being the last of the recent three well sequence, has now been spudded. With a provisional target depth of 2700 m, it is estimated that the well will be drilled in approximately 21 days.

The recently drilled PFE 1001 well is expected to be completed with a work over rig and be on stream by the end of next week.

Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/27112018/president-energy-spuds-third-development-well-in-argentina/

You might also like

Kabel Schlepp

WEBINAR - Key criteria to insure proper selection of a cable drag chain

In this webinar KabelSchlepp will review and discuss the items needed to insure that a cable track is properly selected and sized for the user’s application. How diameters and weights of the fill package effect cable track selection and how the jacket material of the fill package influences the cable track design. Register for free today »

 
 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Upstream news Oil & gas news