GD Energy Products opens new facility in Louisiana, USA
Published by Isabelle Keltie,
Editorial Assistant
Oilfield Technology,
GD Energy Products (GDEP), a total solutions provider for the drilling, well servicing and frac pumps market, has opened a new aftermarket facility to increase customer service and support capabilities in the Louisiana and East Texas region.
The new 9000 ft2 facility is strategically located in Shreveport, Louisiana, to serve customers operating in the Haynesville Shale. Having already worked for GDEP for eight years in customer service roles in Fort Worth and Odessa repair facilities, John Verzwyvelt will serve as the Shreveport facility’s branch manager.
Ben Gile, director of operations, GDEP, said, “GDEP endeavours to constantly improve our customers’ ease of operation by bringing them easy access to high quality aftermarket pump parts and expert on-site field service. Our new Shreveport facility will serve to expand our North American footprint and dramatically improve response time for customer field service, parts, consignment replenishments and repairs. We are looking forward to increasing service levels, parts availability and support to our valued customers in the Haynesville Shale.”
Read the latest issue of Oilfield Technology in full for free: Summer 2022
Oilfield Technology’s second issue of 2022 begins with analysis from Rystad Energy focusing on the upstream industry in Southeast Asia. The rest of the issue is dedicated to features covering advances in drilling, rig design, software and AI, corrosion and maintenance, artificial lift, flow control, and more.
Exclusive contributions come from Vink Chemicals, Archer, Taurex Drill Bits, Vysus, EM&I, SparkCognition, TÜV Rheinland Group, TGT Diagnostics, ChampionX, and Baker Hughes, as well as a guest comment from Patrick Long, Opportune.
Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/07072022/gd-energy-products-opens-new-facility-in-louisiana-usa/
You might also like
Cuba: Block 9 Amistad field development approved
Initial development of Unit 1B formally approved and on track for 1Q25. Export of initial oil cargo on track for end of 2024.