Skip to main content

Upstream project news

 
 
 
 
 
 

ERIELL releases 2020 production figures

Projects were concentrated in Russia and Uzbekistan and the Group drilled 1.33 million m (2019: 1.37 million m). Similarly, the number of wells drilled was almost identical - 344 (2019: 350).

 
 

Amarinth delivers titanium pumps for FPSO vessels in Brazil

The order of four pumps from VWS Westgarth, which supplies and operates sulfate reduction membrane systems, was for chemically enhanced backwash pumps to be installed aboard two FPSO vessels operated by Petrobas off the coast of Brazil.

 

Drilling begins at Dugong appraisal well

The Neptune-operated Dugong discovery, in Production Licence 882, was one of the largest discoveries on the Norwegian Continental Shelf in 2020.