Upstream project news
PDC Energy installs voestalpine connection in Denver-Julesburg Basin
PDC Energy successfully installed 22 248 ft of 5.5-in. x 20.00 ppf VA-EP-P110 VAtitan-TC in the Ferguson 23G-202 well located in the Wattenberg Field in the Denver-Julesburg Basin.
Petrobras pushes Parque das Baleias project back to 2024
Petrobras has postponed the Integrated Project of Parque das Baleias by about one year, with the start of operation and first oil delayed to 2024.
Northern Offshore jack-up begins drilling in Qatar's North Field
The Energy Enticer had a safe and successful mobilisation to Qatar Petroleum’s North Field in early September 2020.
CNX Resources install VAtitan-TC connection in the Utica
CNX Resources have successfully installed 27 361 ft of 5.5” 23# VA-EP-P110-NY VAtitan-TC on the Maj-12 pad in the Pennsylvania Utica Shale.
Weatherford achieves ultra-deepwater sidetrack record
Weatherford achieved the industry’s first 12 ¼-in. casing sidetrack, delivering a 22 ft window in a single trip for an ultra-deepwater well in the Gulf of Mexico.
Equinor and Microsoft collaborate on Northern Lights carbon capture and storage value chain
Equinor has signed a Memorandum of Understanding with Microsoft to explore ways to support the Northern Lights carbon capture and storage project as a technology partner.
CGG starts Walker Ridge reimaging programme
The Walker Ridge programme covers approximately 300 OCS blocks including two priority areas of significant industry interest.
Enpro Subsea enables safe removal of ‘attic’ oil from Brent Bravo’s concrete cells
Enpro’s technology enabled the safe access and removal of ‘attic’ oil from concrete storage cells at the base of the Brent Bravo platform in 140 m water depth.
Touchstone makes natural gas discovery at Chinook
Wireline logs indicated significant natural gas pay totalling approximately 589 net ft at the Ortoire exploration block, onshore in the Republic of Trinidad and Tobago.
Oceaneering awarded BOP tethering services contract by Petrobras
The scope of work includes data acquisition and real-time riser analysis for dynamic positioning rig operations for up to seven wells in water depths between 150 m and 700 m.