Skip to main content

Brazil upstream news

Subsea 7 awarded Mero-3 contract

The contract scope includes engineering, fabrication, installation and pre-commissioning of 80 km of rigid risers and flowlines for the steel lazy wave production system, 60 km of flexible service lines, 50 km of umbilicals and associated infrastructure, as well as installation of FPSO mooring lines and hook-up.

 
 
 

TGS begins Santos Basin 3D survey

The survey is located in the western portion of the Santos Basin and works as a northwest extension of the existing TGS Santos 3D, covering approximately 5000 km2.