Subsea 7 awarded Mero-3 contract
Published by Nicholas Woodroof,
Editor
Oilfield Technology,
The contract scope includes engineering, fabrication, installation and pre-commissioning of 80 km of rigid risers and flowlines for the steel lazy wave production system, 60 km of flexible service lines, 50 km of umbilicals and associated infrastructure, as well as installation of FPSO mooring lines and hook-up.
Project management and engineering will commence immediately at Subsea 7’s offices in Rio de Janeiro and Paris. Fabrication of the pipelines will take place at Subsea 7’s spoolbase at Ubu in the state of Vitória and offshore operations are scheduled to be executed in 2023 and 2024, using Subsea 7’s fleet of reeled rigid pipelay vessels.
Marcelo Xavier, Vice-President Brazil said: “This contract builds on our strong, collaborative relationship with Petrobras and track record of executing major EPCI projects globally. Subsea 7 looks forward to working closely with Petrobras to successfully deliver the project.”
Read the latest issue of Oilfield Technology in full for free: Issue 1 2021
Oilfield Technology’s first issue of 2021 begins with a look at US tight oil’s prospects this year. The issue then moves on to cover completions technology, production forecasting, electric fracturing, sand recovery and more.
Exclusive contributions come from Rystad Energy, Archer, Weatherford, Halliburton, CGG, NOV, TETRA Technologies, Clariant and more.
Read the article online at: https://www.oilfieldtechnology.com/offshore-and-subsea/24052021/subsea-7-awarded-mero-3-contract/
You might also like
Halliburton launches Intelli portfolio of wireline conveyed diagnostic well intervention services
Halliburton Company has announced it has introduced the Intelli suite of diagnostic well intervention wireline logging services.