Weatherford releases new business intelligence and data visualisation platform
The ForeSite production optimisation platform for the oilfield industry is powered by MIcrosoft Power BI.
The ForeSite production optimisation platform for the oilfield industry is powered by MIcrosoft Power BI.
The new network brings together 6000 suppliers and 148 buyers across the UK, Europe and Nordics into one supply chain.
The company's suite of technologies includes desanders, deoilers, multiphase hydrocyclones and microbubble flotation technology for oil and solids removal.
Hexion’s Voyager resin-coating service unit for the Permian Basin will be located at Black Mountain Sand’s El Dorado sand mine in Texas, US.
The Culzean gas field is located in the challenging waters of the North Sea, approximately 145 miles off the coast of Aberdeen.
Paradigm Flow Services were asked to undertake a job to clean 28 cooling units on the Elgin platform in the North Sea.
This is Yokogawa's largest transmitter order to date for an upstream oil and natural gas project in South America.
The system alleviates the impact of modern, large blowout preventers (BOPs) on legacy wellheads by arresting the motion of the BOP stack via four tethers, which are anchored to the seabed.
The DAV MX™ CircSub was deployed in order to avoid the cost of a dedicated jetting assembly run.
The company's new office will focus on talent acquisition and global mobility as the area continues to expand on the back of the Rocky shale boom.
iSEISMIC plans to use ION’s 4Sea ocean bottom acquisition and imaging technology for seabed surveys.
The winning technology will be featured at the 2019 Technical Exposition and Conference, 9 - 11 October in New Orleans, Louisiana, US.
The award recognises a service company or operator who has pushed the boundaries of well intervention and coiled tubing technology.
EM&I have produced a series of four ‘Books’ describing new methods for integrated robotic & digital integrity management technologies.
The fire and gas detection systems are to be retrofitted to legacy control cabinets when the rig was first commissioned.