Operators adopting Churchill technology to tackle stuck pipe
A one-hour cut was achieved by the HyPR HoleSaver after a major operator became stuck around 13 000 ft due to heavy losses.
A one-hour cut was achieved by the HyPR HoleSaver after a major operator became stuck around 13 000 ft due to heavy losses.
The Probabilistic Digital Twin concept was unveiled at Offshore Europe 2019 this week.