Skip to main content

Offshore & subsea

 
 
 
 
 

Shell and Deltic Energy complete Pensacola site survey

The results of the initial phase of the survey will be interpreted and, if required, a second geotechnical phase incorporating the collection of samples from the seabed will be undertaken before the end of the year.

 
 
 
 
 
 
 
 
 

Atteris awarded Dorado subsea FEED

The engineering design work will include flow assurance definition and design of the subsea system connecting the wellhead platform to the FPSO including the flexible flowlines, dynamic risers and a mid-water arch structure.