Skip to main content

Shearwater awarded extension on Nebula survey offshore Brazil

Published by , Editor
Oilfield Technology,


Shearwater has secured a six-month contract extension with CGG on its Nebula survey in the Campos and Santos basins offshore Brazil and is nearing completion of work for CGG on its North Viking Graben survey.

Shearwater has previously conducted work for the extensive Nebula survey and the announced extension will run to the end of 2021.

“We are pleased with this extension in this very promising exploration area, adding more work to Oceanic Sirius and to our overall backlog”, said Irene Waage Basili, CEO of Shearwater.

In the North Sea, Amazon Conqueror has recently concluded its work for CGG on the North Viking Graben survey, where the SW Amundsen continues. Shearwater has utilised two vessels equipped with multi-component streamers, Amazon Conqueror and SW Amundsen, for a total of seven vessel months, following a two-month addition to the original scope.


Read the latest issue of Oilfield Technology in full for free: Issue 3 2021

Oilfield Technology’s third issue of 2021 starts with a report from Wood Mackenzie focusing on the upstream industry’s fortunes in Asia-Pacific. The rest of the issue is dedicated to features covering offshore engineering, coiled tubing, frac technology, completion technologies, water management, well placement and much more.

Exclusive contributions come from Wild Well Control, Cudd Pressure Control, TMK, NOV, Archer, Tendeka, TETRA Technologies and more.

Read the article online at: https://www.oilfieldtechnology.com/offshore-and-subsea/15092021/shearwater-awarded-extension-on-nebula-survey-offshore-brazil/

You might also like

 
 

Embed article link: (copy the HTML code below):