Husky Energy completes commissioning of Liuhua field
The 29-1 field is tied into the existing infrastructure at the Liwan Gas Project, which includes the Liwan 3-1 and Liuhua 34-2 fields within Block 29/26, approximately 300 km southeast of the Hong Kong Special Administrative Region.