Atteris wins FEED contract for Spartan gas field
Published by Nicholas Woodroof,
Editor
Oilfield Technology,
The field is located in Permit WA-33-R off the coast of Western Australia, approximately 40 km west of Varanus Island and 18 km from the John Brookes wellhead platform.
The engineering design work will include the subsea infrastructure connecting the subsea christmas tree (by others) to the John Brookes wellhead platform. The subsea system will consist of an umbilical, a flexible flowline, a flowline end termination structure and a rigid metrology spool.
Atteris’ General Manager Dermot O’Brien said: “We are thrilled with this win and we are grateful for the trust and confidence that Santos has placed in us with yet another significant subsea engineering design scope.”
Read the article online at: https://www.oilfieldtechnology.com/offshore-and-subsea/25092020/atteris-wins-feed-contract-for-spartan-gas-field/
You might also like
Archer secures contract extension for platform drilling services in the UK
The extension will commence 01 May 2024 in direct continuation of the current contract.