Skip to main content

Atteris wins FEED contract for Spartan gas field

Published by , Editor
Oilfield Technology,


Atteris has been awarded the subsea FEED for the Spartan gas field by Santos.

The field is located in Permit WA-33-R off the coast of Western Australia, approximately 40 km west of Varanus Island and 18 km from the John Brookes wellhead platform.

The engineering design work will include the subsea infrastructure connecting the subsea christmas tree (by others) to the John Brookes wellhead platform. The subsea system will consist of an umbilical, a flexible flowline, a flowline end termination structure and a rigid metrology spool.

Atteris’ General Manager Dermot O’Brien said: “We are thrilled with this win and we are grateful for the trust and confidence that Santos has placed in us with yet another significant subsea engineering design scope.”

Read the article online at: https://www.oilfieldtechnology.com/offshore-and-subsea/25092020/atteris-wins-feed-contract-for-spartan-gas-field/

You might also like

 
 

Embed article link: (copy the HTML code below):