Equinor given drilling permit east of Maria field
Published by Nicholas Woodroof,
Editor
Oilfield Technology,
Well 6407/1-8 S and A will be drilled from the West Hercules drilling facility in position 64°59'55.64"N and 7°11'30.1"E after concluding the drilling of wildcat well 34/11-24 S for Equinor in production licence 248 C.
The drilling programme for well 6407/1-8 S & A relates to the drilling of wildcat wells in production licence 263 D. Equinor is the operator with an ownership interest of 80%. The other licensee is Pandion Norge (20%). The area in this licence consists of part of block 6407/1. The well will be drilled about 9 km east of the Maria field.
Production licence 263 D was carved out on 2 March 2018 in APA 2017. This is the first exploration well to be drilled in the licence.
Read the article online at: https://www.oilfieldtechnology.com/offshore-and-subsea/29072020/equinor-given-drilling-permit-east-of-maria-field/
You might also like
McDermott awarded offshore contract by Brazil's BRAVA Energia
Under the contract scope, McDermott will execute the transportation and installation of flexible pipelines, umbilicals and associated subsea equipment for two new wells at the Papa-Terra field and two new wells for the Atlanta Phase 2 development.