Ocean Installer to install production flowline at Guillemot field
Published by Nicholas Woodroof,
Editor
Oilfield Technology,
The award, which is Ocean Installer’s first with Dana, involves the installation and trenching of a 12 in. flexible production flowline at the Guillemot field.
The project will be executed by Ocean Installer’s office in Aberdeen, with engineering work beginning immediately and offshore operations scheduled for 2Q20. The construction support vessel Viking Neptun will be utilised for the offshore work.
“We are delighted to have been awarded this contract and to continue building upon our track record in the UK. This is our first award from Dana Petroleum, so we look forward to establishing a relationship with a key Operator through close cooperation on this project.” said Kevin Murphy, Interim CEO, Ocean Installer.
The Triton FPSO is located in Block 21/30, approximately 193 km/120 miles east of Aberdeen in the Central North Sea, in water depth of 95 m and produces hydrocarbons from the Triton Development. Joint venture partners in the Triton FPSO area are Dana, Tailwind and Endeavour. The Development comprises the fields at Bittern, Gannet E, Guillemot West, Guillemot North-West, Clapham, Pict and Saxon.
Read the article online at: https://www.oilfieldtechnology.com/offshore-and-subsea/24012020/ocean-installer-to-install-production-flowline-at-guillemot-field/
You might also like
TotalEnergies increases its interest in giant field Moho and divests two mature assets
TotalEnergies announces that its 85%-owned affiliate, TotalEnergies EP Congo, has signed an agreement with Trident Energy combining the acquisition of an additional 10% interest in the Moho license from Trident Energy and the sale to Trident Energy of its 53.5% interest in the Nkossa and Nsoko II licenses.