Skip to main content

Energean announces positive results from Karish gas well

Published by , Editor
Oilfield Technology,


Energean Oil and Gas plc has announced successful results from production measurement performed during clean-up of the Karish Main-02 development well, which is located on the crest of the Karish Main structure, offshore Israel.
KM-02 produced from a 35 m interval of the C sand reservoir. The well flowed at a maximum rate of 120 million ft3/d of natural gas, limited only by the capacity of the surface equipment. Performance modelling confirms that the well is capable of delivering at the 300 million ft3/d design capacity when connected to the FPSO.

Read the article online at: https://www.oilfieldtechnology.com/offshore-and-subsea/21022020/energean-announces-positive-results-from-karish-gas-well/

You might also like

Oilfield Technology Spotlight with Swagelok

Mike Aughenbaugh, Associate Target Market Manager, Swagelok, joins us to discuss his article that featured in the July/August 2024 issue of Oilfield Technology magazine.

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Upstream news Offshore news Upstream project news Oil & gas news