Skip to main content

ABB to provide EPS for Jansz-Io Compression project

Published by , Editor
Oilfield Technology,


ABB has won an order worth approximately US$120 million to supply the overall Electrical Power System (EPS) for the Jansz-Io Compression (J-IC) project. The order, comprising contracts with Chevron Australia Pty Ltd and with Aker Solutions, is booked in 3Q21.

The Jansz-Io field is located around 200 km offshore the north-western coast of Australia, at water depths of approximately 1400 m. The field is a part of the Chevron-operated Gorgon natural gas project, one of the world’s largest natural gas developments. The project will involve the construction and installation of a 27 000-t (Topside and Hull) normally unattended floating Field Control Station (FCS), approximately 6500 t of subsea compression infrastructure and a 135 km submarine power cable linked to Barrow Island.

“The Jansz-Io Compression project is a major enabler in maintaining an important source of natural gas to customers in Asia Pacific. It will support energy transition across the region where many countries primarily rely on coal for energy generation,” said Peter Terwiesch, President, Process Automation at ABB. “Burning natural gas produces around half as much carbon dioxide per unit of energy compared with coal. We’re proud to be leading the way in the global energy industry by pioneering innovative subsea power technologies that bring us closer to a carbon neutral future. This project reflects our close collaboration and trusted subsea history with Chevron and Aker Solutions.”

“This game changing technology significantly reduces power consumption and emissions compared to power generated offshore by local gas turbines and compressors located topside.” said Brandon Spencer, President, Energy Industries at ABB. “Subsea compressors are key to helping improve reservoir recoverability and ensuring optimal use of resources from existing fields.”

“This is a very important project for us as it supports our commitment to enable lower-carbon oil and gas production and develop renewable solutions to meet future energy needs. We are pleased to once again be joining forces with ABB to take subsea solutions to the next level and accelerate the transition to sustainable energy production,” added Maria Peralta, Subsea Executive Vice-President at Aker Solutions.

ABB will provide the majority of the electrical equipment, both topside and subsea, for J-IC. The project will combine two core ABB technologies - power from shore and Variable Speed Drive (VSD) long step-out subsea power - for the first time. The electrical system will be able to transmit 100 megavolt-amperes over a distance of approximately 140 km and at depths of 1400 m.

The contract was awarded following concept development and a FEED study. Work will start immediately and the subsea compression system is expected to be in operation in 2025.


Read the latest issue of Oilfield Technology in full for free: Issue 2 2021

Oilfield Technology’s second issue of 2021 starts with a report from KPMG that examines the outlook for the Scottish oil and gas sector. The rest of the issue is dedicated to articles covering the offshore supply chain industry, offshore asset integrity, expandable liner technology, advances in drilling, data security, flow control, EOR and methane emissions.

Exclusive contributions come from Tata Steel, EM&I Group, 3X Engineering, Enventure Global Technology, Varel Energy Solutions, Adrilltech, Tendeka and more.

Read the article online at: https://www.oilfieldtechnology.com/offshore-and-subsea/19082021/abb-to-provide-eps-for-jansz-io-compression-project/

You might also like

 
 

Embed article link: (copy the HTML code below):