Skip to main content

SBM Offshore receives FEED contract

Published by , Digital Assistant Editor
Oilfield Technology,


SBM Offshore has reported that Premier Oil plc has awarded the company the Front-End Engineering and Design (FEED) contract for an FPSO for Phase 1 of its Sea Lion development in the North Falkland Basin.

The 18-month contract covers the FEED elements of the proposed FPSO. The asset will be a converted FPSO with a throughput capacity of approximately 85 000 bpd. It will operate in 450 m of water.

The proposed Phase 1 Sea Lion project, operated by Premier with Rockhopper Exploration plc as the JV partner, is located 220 kilometers north of the Falkland Islands. This first phase is subject to final investment decision targeted for the end of the FEED in the 2H17. Subsequent phases to developing Sea Lion and the wider North Falkland Basin reserves, utilising FPSOs, are planned.

Edited from press release by

Read the article online at: https://www.oilfieldtechnology.com/offshore-and-subsea/13012016/sbm-offshore-secures-feed-contract-1898/

You might also like

Why electric submersible pump (ESP) optimisation starts with motor control

Motaz Hassan, Global Application Manager - Artificial Lift Solutions at ABB, Motion Drive Products, explores some of the most common ESP challenges from backspin and gas lock to underload conditions. He then explains how application-specific drive control helps improve reliability, protect equipment and support production continuity.

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Oil & gas news