Consent for start-up of subsea facility on the Balder field
Published by Louise Mulhall,
Editorial Assistant
Oilfield Technology,
The Norwegian Petroleum Directorate has granted ExxonMobil, operator and sole licensee in production licence 001, consent to start-up a subsea facility for production well 25/11-E-29 AH on the Balder field.
The Balder oilfield has been producing since 1999. The field, which is located in the central part of the North Sea, was developed with subsea wells that are connected to a production and storage vessel, Balder FPSO.
The oil is transported by tanker.
Adapted from a press release by Louise Mulhall
Read the article online at: https://www.oilfieldtechnology.com/offshore-and-subsea/11072016/consent-for-start-up-of-subsea-facility-on-the-balder-field/
You might also like
Innovex completes divestment of subsea tree product line
Innovex will retain intellectual property rights for the recently installed subsea tree orientation systems (VXTe) with the intent of licensing this technology to subsea tree manufacturers.