Aker Solutions to deliver umbilicals for King's Quay development
Published by Nicholas Woodroof,
Editor
Oilfield Technology,
The work scope includes 22 km (14 miles) of dynamic steel-tube umbilicals and distribution equipment to connect the King’s Quay floating production system (FPS) to the Samurai, Khaleesi and Mormont deepwater developments.
The King's Quay semisubmersible FPS will be located around 280 km (175 miles) south of New Orleans in the Green Canyon area.
"We look forward to working with Subsea 7 on one of the largest subsea development projects in the Gulf of Mexico," said Jonah Margulis, vice president and country manager for Aker Solutions in the United States. "Aker Solutions and Subsea 7 have built a collaborative and high-performing relationship over time, with a strong track-record of excellent project execution."
The engineering, design and manufacturing of the umbilicals and distribution equipment will take place at Aker Solutions' facility in Mobile, Alabama, US (pictured). The work starts immediately and the delivery is planned for 4Q21.
The contract will be booked as order intake in 2Q20.
Image courtesy of Aker Solutions
Read the article online at: https://www.oilfieldtechnology.com/offshore-and-subsea/10062020/aker-solutions-to-deliver-umbilicals-for-kings-quay-development/
You might also like
Chevron commits an additional US$250 000 to hurricane relief efforts
Chevron has announced a donation of US$250 000 to support relief and recovery efforts after Hurricane Milton devastated parts of Florida.