Premier commence gas production
Premier has announced that gas production from the Pelikan field in the Natuna Sea Block A offshore Indonesia commenced on 9 March 2015. This follows first gas from the Naga field, also on Natuna Sea Block A, in November 2014. Both projects were brought on-stream to budget.
Pelikan and Naga will deliver additional reserves into the Singapore and domestic market under the company’s long term gas contracts. Deliverability from the two fields of up to 200 BBtud will allow Premier increased operational flexibility, additional volumes to be supplied to meet growing market share within existing contracts and, when the opportunity arises, to respond to increased Singapore or domestic gas demand.
Premier, with a 28.67% equity stake, operates Natuna Sea Block A on behalf of its partners KUFPEC, Pertamina, PTT and Petronas.
Read the article online at: https://www.oilfieldtechnology.com/offshore-and-subsea/10032015/premier-announces-gas-production-pelikan-588/
You might also like
Why electric submersible pump (ESP) optimisation starts with motor control
Motaz Hassan, Global Application Manager - Artificial Lift Solutions at ABB, Motion Drive Products, explores some of the most common ESP challenges from backspin and gas lock to underload conditions. He then explains how application-specific drive control helps improve reliability, protect equipment and support production continuity.