Seatrium secures FPSO topside modules fabrication contract from MODEC
Published by Emily Thomas,
Deputy Editor
Oilfield Technology,
BrasFELS Shipyard, a member of the Seatrium Group, has announced that it has secured a contract from Offshore Frontier Solutions Pte. Ltd, a MODEC Group company, to undertake parts of the topside modules fabrication of a Floating Production Storage and Offloading (FPSO) for the Raia project in Brazil, operated by Equinor on behalf of the Consortium in the Raia project.
The latest win marks the eighth project collaboration between BrasFELS and MODEC, reflecting the long-standing partnership the two organisations have enjoyed for more than a decade.
Mr Marlin Khiew, Executive Vice President, Oil & Gas (Americas), Seatrium said, "We are pleased to partner with MODEC on yet another FPSO topside modules fabrication project, affirming Seatrium’s position as a leading global player in FPSO newbuilds and conversions. Over the years, we have leveraged our deep engineering expertise, international yard footprint and strong track record to deliver over 260 Floating Production Unit (FPU) and FPSO conversions and newbuilds, solidifying our market leadership in this product segment.”
BrasFELS’ scope of work for the FPSO Raia comprises the fabrication of three modules: vapour recovery unit/flare knockout (VRU/ FLARE KO); oil separation and stabilisation; and the flowline circulation and metering and utility systems.
The project will be undertaken by Seatrium’s BrasFELS shipyard located in Angra dos Reis, Rio de Janeiro, Brazil, and is expected to commence work in the first quarter of 2024.
When completed, FPSO Raia will have the capacity to process 126 boe/d and 16 million m3 of gas per day, with a storage capacity of two million bbl of crude oil. The FPSO will be deployed in the giant ‘pre-salt’ area at the southern part of Campos Basin, approximately 200 km off the coast of Rio de Janeiro, Brazil.
The first project between BrasFELS and MODEC was the fabrication and integration of topside modules for FPSO Cidade de Sao Paulo, back in February 2011.
Read the article online at: https://www.oilfieldtechnology.com/offshore-and-subsea/04122023/seatrium-secures-fpso-topside-modules-fabrication-contract-from-modec/
You might also like
Oilfield Technology Spotlight with Swagelok
Mike Aughenbaugh, Associate Target Market Manager, Swagelok, joins us to discuss his article that featured in the July/August 2024 issue of Oilfield Technology magazine.