Halliburton and VoltaGrid to deploy all-electric fracturing solution in Haynesville Shale
Published by Nicholas Woodroof,
Editor
Oilfield Technology,
The solution combines Halliburton’s all-electric fracturing spread, featuring the Zeus™ 5000 horsepower electric pumping unit, with VoltaGrid’s power generation system to offer increased reliability and real-time emissions tracking.
“All-electric fracturing represents an exciting approach to our overall strategy to reduce emissions in our operations,” said Paul Sander, chief operating officer & partner at Aethon Energy. “We’re pleased to work with Halliburton and VoltaGrid to utilize more sustainable fracturing solutions and look forward to realizing enhanced operational efficiencies for our industry.”
“We understand the importance of efficiency in high performing fracturing operations,” said Michael Segura, vice president of Production Enhancement, Halliburton. “Our innovative all-electric fracturing solutions deliver superior performance while significantly reducing fuel costs and emissions for our customers.”
Read the latest issue of Oilfield Technology in full for free: Issue 3 2021
Oilfield Technology’s third issue of 2021 starts with a report from Wood Mackenzie focusing on the upstream industry’s fortunes in Asia-Pacific. The rest of the issue is dedicated to features covering offshore engineering, coiled tubing, frac technology, completion technologies, water management, well placement and much more.
Exclusive contributions come from Wild Well Control, Cudd Pressure Control, TMK, NOV, Archer, Tendeka, TETRA Technologies and more.
Read the article online at: https://www.oilfieldtechnology.com/hydraulic-fracturing/12102021/halliburton-and-voltagrid-to-deploy-all-electric-fracturing-solution-in-haynesville-shale/
You might also like
Strohm’s TCP Jumpers installed at Deepwater Sabah project offshore Malaysia
Installed by contractor McDermott on behalf of an international operator, it is the second time the firm’s TCP product has been deployed in Malaysia.