PSA investigates Statoil well control incident at Visund
Published by Louise Mulhall,
Editorial Assistant
Oilfield Technology,
Statoil will be investigated by the PSA in response to a well control incident during a drilling operation on the company’s Visund oilfield which resulted in problems with shut off valves on the subsea installation.
An inflow and pressure increase were registered in the well's annulus. Production on the field was halted and the operator began demanning the facility. The BOP was intact, but problems were reported in operating shutoff valves on the top of the drillstring.
It has been reported that the incident did not cause any hydrocarbon leaks.
As a result of the incident, the PSA is to carry out an investigation focusing on Statoil's planning and execution of the well operation.
The objects of the investigation include clarifying the chain of events and identifying proximate and underlying causes.
Following the investigation a report will be published on ptil.no.
Adapted from a press release by Louise Mulhall
Read the article online at: https://www.oilfieldtechnology.com/hse/22032016/psa-investigates-statoil-well-control-incident-at-visund/
You might also like
Urgent oil and gas decommissioning could deliver 25 000 jobs for North Sea workers
Urgent action to ensure oil and gas companies meet their legal obligations to safely remove ageing oil and gas infrastructure from the North Sea could create up to 25 000 UK jobs and deliver up to £15 billion in economic benefit to the UK, a new first-of-its-kind report shows.