Aker BP receives consent for exploration and production drilling in the North Sea
Published by Aimee Knight,
Editorial Assistant
Oilfield Technology,
The well has the following coordinates:
- 59° 20' 29.01" N
- 01° 49' 55.32" E
Water depth at the site is around 119 m.
The operation is scheduled to begin in Q1 2019 and to last 94 days.
Aker BP must apply for separate consent to begin test production from the well.
Drilling is to be carried out using the Scarabeo 8 mobile drilling facility. This is a semi-submersible drilling facility of the Moss CS50 MKII type, operated by Saipem Norge. It was built in Russia and Italy and put into service in 2012. The facility is classified by DNV GL and registered in the Bahamas.
Read the article online at: https://www.oilfieldtechnology.com/exploration/30112018/aker-bp-receives-consent-for-exploration-and-production-drilling-in-the-north-sea/
You might also like
TotalEnergies increases its interest in giant field Moho and divests two mature assets
TotalEnergies announces that its 85%-owned affiliate, TotalEnergies EP Congo, has signed an agreement with Trident Energy combining the acquisition of an additional 10% interest in the Moho license from Trident Energy and the sale to Trident Energy of its 53.5% interest in the Nkossa and Nsoko II licenses.