TGS, BGP, CGG begin first phase of Suriname 3D survey
Published by Nicholas Woodroof,
Editor
Oilfield Technology,
The 3D survey is adjacent to the prolific Block 58 and will cover the up-dip portions of the same Upper Cretaceous channel systems proven successful recently.
Phase 1 includes 11 100 square kilometers of new 3D seismic data acquisition and 3000 square kilometers of 3D seismic data reprocessing. The acquisition will be undertaken by the BGP Prospector.
CGG will process all of this multi-client data in its Houston subsurface imaging centre using a high-end depth imaging workflow, including its proprietary technologies: Time-Lag Full-waveform Inversion (TLFWI) and High-frequency FWI Imaging.
Early products will be available from April 2022 with final TTI Kirchhoff PSDM products ready from November 2022.
This project is supported by industry funding.
Read the latest issue of Oilfield Technology in full for free: Issue 3 2021
Oilfield Technology’s third issue of 2021 starts with a report from Wood Mackenzie focusing on the upstream industry’s fortunes in Asia-Pacific. The rest of the issue is dedicated to features covering offshore engineering, coiled tubing, frac technology, completion technologies, water management, well placement and much more.
Exclusive contributions come from Wild Well Control, Cudd Pressure Control, TMK, NOV, Archer, Tendeka, TETRA Technologies and more.
Read the article online at: https://www.oilfieldtechnology.com/exploration/11112021/tgs-bgp-cgg-begin-first-phase-of-suriname-3d-survey/
You might also like
API data reveals huge rise in US crude oil inventories
Levels rose by almost 11 million bbl over the last few days, far higher than the previous week.