Viking announces fulfillment of upper completion project in onshore North Africa
Viking Completion Technology completes milestone delivery to African energy project.
Viking Completion Technology completes milestone delivery to African energy project.
Pantheon Resources plc, the oil and gas company developing the Kodiak and Ahpun projects near pipeline and transportation infrastructure on Alaska's North Slope, announces the timing of the hydraulic fracture stimulation and associated well testing for the Dubhe-1 well.
IMI delivers ‘largest production’ choke valves to landmark North Sea unmanned production platform.
Wood Mackenzie’s analysis using new AI-powered tools shows existing fields could yield 470 billion to over 1000 billion additional bbls through proven recovery methods.
Aquaterra Energy awarded early-stage subsea analysis contracts with INPEX in Indonesia.
The move has bolstered the company’s contract pipeline to $20bn (£14.77bn) over the next 20 years.
The GGIP aims to sustainably develop Iraq’s natural resources to improve the country’s electricity supply while contributing to its energy independence and reducing its greenhouse gas (GHG) emissions.
If current trends persist, future energy demand will outpace demand expectations in many scenarios, positioning natural gas as the most scalable and responsive solution to meet growing power needs and stabilise grids.
This job is the first in a series of transports that will culminate in the transport of the PWP Topside, weighing approximately 18 800 t.
Joel Shaw, Silverwell Energy, USA, examines how surface-controlled gas lift systems will play a greater role in maximising the potential of gas-lifted wells while minimising environmental impact and operational costs.
The project is located in the western Pearl River Mouth Basin, with an average water depth of approximately 150 m.
Expro sets offshore World Record with heaviest casing string deployment.
GHGSat satellites deployed to monitor methane at scale across ExxonMobil’s onshore operations.
CNOOC Ltd has announced its 2025 interim results.
Wildcat well 7117/4-1 was drilled in production licence 1238, 135 km west of the Snøhvit field and 260 km northwest of Hammerfest.