Skip to main content

Drilling & production

 

Optimising full-cycle production

Eric Lookofsky and Matt Miller, Newpark Drilling Fluids, USA, discuss how key facility investments have aided the development of drilling, completion and stimulation products.

 
 
 
 
 
 
 

Spirit Energy raises production from Chiswick field

First gas from a new well at Spirit Energy’s Chiswick field in the Southern North Sea was achieved in July 2019 and has added up to an additional 25 million ft3/d of gas to the field.

 

Tambak-2 well closed

During operations to recover a failed packer, the well started flowing natural gas to surface. For safety reasons, the well was immediately shut in.

 
 
 
 

Petro Matad releases results of testing at Heron-1 well

DST2 was performed over a 12 m interval from 2834 m in the upper portion of the Lower Tsagaantsav Formation. The zone flowed oil and some associated gas to surface without the need for any artificial lift.

 

Caterpillar reports 3Q19 results

The company has announced 3Q19 sales and revenues of US$12.8 billion, a 6% decrease compared with US$13.5 billion in 3Q18. The decrease has been attributed to a US$1.2 billion movement in dealers’ inventories.