Tendeka awarded completion contract by Mubadala Petroleum
Published by Nicholas Woodroof,
Editor
Oilfield Technology,
The deal will see Tendeka supply its FloElite sand screens and FloSure Autonomous Inflow Control Devices (AICDs) to Mubadala Petroleum’s Jasmine, Manora and Nong Yao fields in the Gulf of Thailand. The contract also has the option of two one-year extensions.
Keith Parrott (pictured), Tendeka’s South East Asia area manager, said: “This contract ensures our presence in Thailand for the next three to five years and serves as a basis to grow further across the region and emphasises our commitment in providing technology to increase oil recovery rates for life of field.
“There is a significant challenge with early water breakthrough on oil producers. Our technology has the ability to choke back unwanted water from being produced to surface and is recognised for delivering marked production enhancement around the world.
“We have previously supplied and installed AICD completions for Mubadala Petroleum with great success and look forward to delivering impressive results with the team again on this project.”
Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/30032020/tendeka-awarded-completion-contract-by-mubadala-petroleum/
You might also like
Orlen discovers 'big’ oilfield in western Poland
The oilfield was discovered in the Lubuskie region next to the existing Rzeczyca field which holds 100 000 metric t of oil, says Reuters.