Total hires Shelf Drilling rig for operations offshore Nigeria
Published by Nicholas Woodroof,
Editor
Oilfield Technology,
The contract is for five wells, for a duration estimated to be 380 days, plus additional option period, and is expected to commence in June 2021.
Read the latest issue of Oilfield Technology in full for free: Issue 2 2021
Oilfield Technology’s second issue of 2021 starts with a report from KPMG that examines the outlook for the Scottish oil and gas sector. The rest of the issue is dedicated to articles covering the offshore supply chain industry, offshore asset integrity, expandable liner technology, advances in drilling, data security, flow control, EOR and methane emissions.
Exclusive contributions come from Tata Steel, EM&I Group, 3X Engineering, Enventure Global Technology, Varel Energy Solutions, Adrilltech, Tendeka and more.
Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/29062021/total-hires-shelf-drilling-rig-for-operations-offshore-nigeria/
You might also like
Cuba: Block 9 Amistad field development approved
Initial development of Unit 1B formally approved and on track for 1Q25. Export of initial oil cargo on track for end of 2024.