Serica Energy forced to halt production from Rhum field
Published by Nicholas Woodroof,
Editor
Oilfield Technology,
There are currently no safety or environmental issues associated with this fault. A programme to replace the control module is being planned utilising a spare module held in stock. This will necessitate diving operations and the timetable is not yet finalised. It is likely, however, that Rhum production will not resume for at least 2 weeks.
Mitch Flegg, Chief Executive of Serica Energy, commented: "This is a frustrating event, but I am confident our skilled teams onshore and offshore will safely and efficiently implement the required repairs using equipment and plans already in place to deal with such a situation. Production from Bruce, Erskine and Columbus has consistently averaged over 10,000boe/d net to Serica so far this year. We expect these rates to continue during the Rhum shut down and we will look for ways to optimise the Bruce production rates during this period.”
Read the latest issue of Oilfield Technology in full for free: Issue 4 2021
The issue starts with a report from Rystad Energy focusing on the outlook for the upstream industry in the Middle East. The rest of the issue is dedicated to features covering production optimisation, drill bits, pipeline integrity, health and safety, and more.
Exclusive contributions come from Varel Energy Solutions, Rystad Energy, Gyrodata, 3X Engineering, Tracerco, Ulterra Drilling Technologies and more.
Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/28022022/serica-energy-forced-to-halt-production-from-rhum-field/
You might also like
Halliburton launches Intelli portfolio of wireline conveyed diagnostic well intervention services
Halliburton Company has announced it has introduced the Intelli suite of diagnostic well intervention wireline logging services.