Petrosibir AB: Update on drilling in Bashkiria
Published by Louise Mulhall,
Editorial Assistant
Oilfield Technology,
As previously announced Petrosibir commenced drilling well #9 on Ayazovskoye in Bashkiria in August.
The new well is located approximately 400 m north of the successful well #12. A target depth of 2596 m has been reached and the well has now been completed and oil has been found. Petrosibir is currently carrying out production tests. The tests are estimated to be completed within two weeks, whereupon Petrosibir will announce the results regarding volumes and possible further steps in the drilling programme.
For more information please visist: www.petrosibir.com
Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/27102016/petrosibir-ab-update-on-drilling-in-bashkiria/
You might also like
DNV: UK energy transition falling short due to lack of ‘whole system’ thinking
UK remains global decarbonisation frontrunner but will miss 2030 clean power target, 2035 Nationally Determined Contribution (NDC) and legally binding 2050 net zero goal, according to a new report from DNV.