ONGC contracts Shelf Drilling rig
Published by Nicholas Woodroof,
Editor
Oilfield Technology,
The rig is currently under contract with ONGC with a scheduled completion date in 2Q22. The planned start-up of operations under the new contract is 4Q22.
Read the latest issue of Oilfield Technology in full for free: Issue 3 2021
Oilfield Technology’s third issue of 2021 starts with a report from Wood Mackenzie focusing on the upstream industry’s fortunes in Asia-Pacific. The rest of the issue is dedicated to features covering offshore engineering, coiled tubing, frac technology, completion technologies, water management, well placement and much more.
Exclusive contributions come from Wild Well Control, Cudd Pressure Control, TMK, NOV, Archer, Tendeka, TETRA Technologies and more.
Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/24112021/ongc-contracts-shelf-drilling-rig/
You might also like
Petrobras sets new production records at its refineries
Petrobras has reported that the Total Utilization Factor (FUT) of its refineries reached 96.8% in September, representing the highest monthly result in 2024.