Skip to main content

Warwick West well spudded by Hurricane Energy

Published by , Editor
Oilfield Technology,


Hurricane Energy has announced that the 204/30b-A Warwick West well was spudded on 24 September 2019 using the Transocean Leader rig.

Warwick West is the third and final well of the 2019 Greater Warwick Area drilling programme on Hurricane's Lincoln and Warwick assets.

Hurricane has a 50% interest in the Greater Warwick Area following Spirit Energy's farm-in to the P1368 South and P2294 licences in September 2018.

Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/24092019/warwick-west-well-spudded-by-hurricane-energy/

You might also like

Curbing GHG emissions and costs

Michael Weidenfeller, Product Strategy Manager for Drilling and Mobile Power Applications, Caterpillar Oil & Gas, highlights how fuel-flexible dual-fuel engine technology is an important and reliable solution to reduce diesel consumption on oil and gas rigs.

 
 

Embed article link: (copy the HTML code below):