Skip to main content

FAR Limited: Samo-1 well commences drilling offshore The Gambia

Published by , Editorial Assistant
Oilfield Technology,


The Stena Drillmax arrived on site on Sunday, 21 October and after standard pre-drill operations, the well was successfully spudded. The Samo-1 well will be drilled in 1000 m of water depth to a planned depth of approximately 3100 m.

The Samo Prospect has two key reservoir intervals and is assessed to contain a combined Prospective Resource of 825 million bbls (recoverable, gross, best estimate, unrisked - refer ASX announcement of 21 Nov 2017). Drilling will be followed by wireline logging. Good quality reservoirs have been interpreted from 3D seismic data at both levels at the proposed Samo-1 well location and the well is being drilled near the crest of the structure. FAR has a 40% interest in the A2 and A5 blocks and is operator.

FAR’s managing director Cath Norman said, “This is a very exciting time for FAR as we embark on our first exploration drilling program since the 11 successful wells drilled in neighboring Senegal. The Samo-1 well is the first well to be drilled offshore The Gambia for 40 years and because of this, it is attracting wide international attention. I am grateful for the hard work of the operational team in preparing for the Samo-1 well and the strong co-operation of our co-venture partner PETRONAS and the Government of the Gambia. We join our stakeholders in looking forward to safe and efficient operations. As is standard in offshore exploration drilling, FAR will be running a tight hole operation - we look forward to making updates as we reach important milestones.”

Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/23102018/far-limited-samo-1-well-commences-drilling-offshore-the-gambia/

You might also like

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Upstream news Offshore news Oil & gas news