AS Norske Shell receives consent to use Island Constructor
Published by David Bizley,
Senior Editor
Oilfield Technology,
AS Norske Shell has received consent for the use of Island Constructor for the start-up of well 6407/9-G-5 on the Draugen field.
Draugen is an oil field in the Norwegian Sea in 250 metres of water. The field has been developed using a fixed concrete facility with an integrated deck. Stabilised oil is stored in tanks in the base of the facility.
Island Constructor is a facility designed for well intervention which is operated by Island Offshore Management AS. The facility received Acknowledgement of Compliance (AoC) in September 2010.
Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/21072017/as-norske-shell-receives-consent-to-use-island-constructor/
You might also like
Choosing the right hose
Jonathan Petit, Trelleborg Oil and Marine, argues that, amid the surge in global oil demand, with Ship-to-Ship (STS) operations growing in popularity, choosing the right marine hoses will play a key role in delivering the cost efficiencies required to take full advantage of this opportunity.