Skip to main content

Statoil resumes production on Njord A platform

Oilfield Technology,


Statoil has resumed oil and gas production on the Njord A platform in the Norwegian Sea, following a major reinforcement of the platform structure.

Extensive analyses and inspections in 2013 revealed a need to reinforce the Njord A platform structure. To be on the safe side, Statoil opted to keep production shut down until the reinforcements were in place.

"We have extended Njord's lifetime by improving recovery on the field, and by finding more oil and gas in the area. The Njord A platform has been with us the entire time, and we want to make sure that the structure can withstand the loads it will be exposed to," commented head of Njord operations Arve Rennemo.

The work carried out has strengthened the structure, so the platform can resume production. The work of reinforcing the structure has mainly consisted of bracing the primary beams and struts, and increasing the length of the secondary beams under the platform.

The long-range plan is to further bolster the platform to prepare it for future drilling operations and an extended lifetime on the Njord field.

"Njord A will produce oil and gas until the summer of 2016, after which it will be taken to shore for additional upgrades which will allow us to use the drilling system on board, and prepare it for many more good years of service on the Norwegian shelf," Rennemo added.

Statoil is currently assessing how the Njord area and the Haltenbanken area in the Norwegian Sea can be further developed.


Adapted from press release by Katie Woodward

Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/21072014/statoil-resumes-oil-and-gas-production-on-njord-a-platform-1091/

You might also like

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Oil & gas news