Commercial oil production begins at Layang field offshore Malaysia
Published by Nicholas Woodroof,
Editor
Oilfield Technology,
Layang Field (“Layang”), in addition to its natural gas production since May 2017, commenced oil production by using a Floating Production, Storage and Offloading System (FPSO) named “FPSO Helang”.
The production of oil from Layang is estimated at about 3000 bpd, and about 10 000 boe/d with natural gas combined.
“FPSO Helang” is also planned to be utilised for production and shipping of oil from the Helang field in Block SK10. The production of oil and natural gas from Layang and Helang with the use of “FPSO Helang” is estimated to reach about 20 000 boe/d.
Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/20122019/commercial-oil-production-begins-at-layang-field-offshore-malaysia/
You might also like
Global recoverable oil reserves hold steady at around 1500 billion bbl
Rystad Energy’s latest research shows global recoverable oil reserves held largely steady at around 1500 billion bbl, down some 52 billion bbl from the company’s 2023 analysis.