Commercial oil production begins at Layang field offshore Malaysia
Published by Nicholas Woodroof,
Editor
Oilfield Technology,
Layang Field (“Layang”), in addition to its natural gas production since May 2017, commenced oil production by using a Floating Production, Storage and Offloading System (FPSO) named “FPSO Helang”.
The production of oil from Layang is estimated at about 3000 bpd, and about 10 000 boe/d with natural gas combined.
“FPSO Helang” is also planned to be utilised for production and shipping of oil from the Helang field in Block SK10. The production of oil and natural gas from Layang and Helang with the use of “FPSO Helang” is estimated to reach about 20 000 boe/d.
Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/20122019/commercial-oil-production-begins-at-layang-field-offshore-malaysia/
You might also like
Viridien completes reimaging of BM-S-2 multi-client survey in Brazil’s southern Santos Basin
Viridien successfully completes BM-S-2 seismic reimaging project in the southern Santos Basin.