Skip to main content

Tendrara well drilled to final casing point

Published by , Editorial Assistant
Oilfield Technology,


Sound Energy, the European and African focused upstream company, has announced that the second Tendrara well has now been drilled to the third and final casing point at a measured depth (MD) of 2623 m and that operations have started to set and cement the 7" liner in the TAGI-I shale formation. The well is now approximately 10 m from the target TAGI-I reservoir.

The company will now proceed to drill the reservoir to the final TD.

For more information, please visit: http://www.soundenergyplc.com/


Adapted from a press release by Louise Mulhall

Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/19092016/tendrara-well-drilled-to-final-casing-point/

You might also like

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Oil & gas news