Tendrara well drilled to final casing point
                            
                                
                                
                                        
                                            
                                        
                                
                                    
                                        Published by Louise Mulhall,
                                        Editorial Assistant
                                        
                                    
                                Oilfield Technology,
                                
                            
                        
Sound Energy, the European and African focused upstream company, has announced that the second Tendrara well has now been drilled to the third and final casing point at a measured depth (MD) of 2623 m and that operations have started to set and cement the 7" liner in the TAGI-I shale formation. The well is now approximately 10 m from the target TAGI-I reservoir.
The company will now proceed to drill the reservoir to the final TD.
For more information, please visit: http://www.soundenergyplc.com/
Adapted from a press release by Louise Mulhall
Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/19092016/tendrara-well-drilled-to-final-casing-point/
You might also like
DNV proposes revised risk management framework for UK offshore renewables industry, built on oil and gas best practice
DNV has released a comprehensive study comparing major accident risks and risk management practices in the UK between the offshore oil and gas and the offshore renewables industries.
 
                                