Tendrara well drilled to final casing point
Published by Louise Mulhall,
Editorial Assistant
Oilfield Technology,
Sound Energy, the European and African focused upstream company, has announced that the second Tendrara well has now been drilled to the third and final casing point at a measured depth (MD) of 2623 m and that operations have started to set and cement the 7" liner in the TAGI-I shale formation. The well is now approximately 10 m from the target TAGI-I reservoir.
The company will now proceed to drill the reservoir to the final TD.
For more information, please visit: http://www.soundenergyplc.com/
Adapted from a press release by Louise Mulhall
Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/19092016/tendrara-well-drilled-to-final-casing-point/
You might also like
EnerMech wins major subsea pre-commissioning contract for Subsea7 on Trion development
This latest award reinforces EnerMech’s strong capability in the Americas and its commitment to supporting clients with technical expertise, operational reliability and integrated solutions that improve certainty across complex offshore developments.