Skip to main content

Statoil awards Tendeka with additional work

Published by , Editor
Oilfield Technology,


The additional scope covers the provision of specialist sand screens and inflow control technologies for the new Cat-J rigs, Askeladden and Askepott. Statoil have awarded this for a period of 4-years with the option to extend by two additional 2-year periods.

The two Cat-J rigs are operated under the Oseberg and Gullfaks licences, located in the Norwegian sector of the North Sea. They are tailor-made for harsh environment, shallow wells operating in depths of up to 150 m and with drilling capabilities of up to 10 000 m. The arrival of these two new rigs in the second quarter of 2017 will ensure continued development of the Oseberg and Gullfaks fields.

Gary Smart, Chief Executive Officer of Tendeka said:

“We look forward to working with the Gullfaks and Oseberg teams to provide operational efficiencies and production optimisation, in line with that shown previously on Troll. This award strengthens our relationship with Statoil and highlights our continued commitment to the North Sea”

As part of this award, Tendeka has been granted a non-exclusive work scope for the further supply of sand screens, inflow control and swellable packers to a broader range of assets within the Norwegian Continental Shelf (NCS).

Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/18052017/statoil-awards-tendeka-with-additional-work/

You might also like

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Upstream news Offshore news Oil & gas news