LUKOIL begins construction at Rakushechnoye field
Published by Aimee Knight,
Editorial Assistant
Oilfield Technology,
Commercial oil production, with an estimated plateau level of 1.2 million t, is expected to commence in 2023. Proximity to the ?ompany's other Caspian fields makes it possible to use already available power supply facilities and infrastructure for the treatment and shipping of the products, thus contributing to an overall optimisation of the project.
The Rakushechnoye field's infrastructure includes an ice-resistant fixed offshore platform and a living-quarter platform, interconnected with a gallery bridge. All the facilities will be built by a Russian contractor at shipbuilding yards in the Astrakhan Region.
Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/16102018/lukoil-begins-construction-at-rakushechnoye-field/
You might also like
New Wave Offshore Energy receives surveyor contract
New Wave Offshore Energy has been selected as the marine warranty surveyor for Sinopec supporting Totalenergies’ Agup Phase 2 Development in Iraq.